ENOC

Project Description

HETL intends to extend the existing Jet Fuel pipeline system with a branch to Al Maktoum International Airport. Project consists of installing a 20” underground pipeline for length of 16.5 Km from the existing intermediate pigging station to AMIA Fuel Farm, installing a Jet Fuel filtering station at AMIA Fuel Farm and tie in to AMIA Fuel Farm fuel supply piping manifold.

The Works shall be carried out at different locations :

  • Horizon Emirates Terminal (located within Jebel Ali Free Zone) 
  • IPS – Intermediate Pigging Station 
  • AMIA Fuel farm 
  • Pipeline corridors owned by DUSUP, RTA /DM and corridor and plots owned by DWC-Dubai South
  • Detailed Scope
  • Pipeline corridors 

Pipeline corridors owned by DUSUP, RTA /DM and corridor and plots owned by DWC-Dubai South

  • Supply and installing a 20” underground pipeline for length of 16.5 Km from the existing intermediate pigging station to AMIA Fuel Farm.
  • Associated Excavation and Backfilling works ,Dewatering & Shoring Works
  • Road crossing Works along the pipe line route

Horizon Emirates Terminal (located within Jebel Ali Free Zone)

  • Supply , Installation and commissioning of one (1) new Jet Fuel Transfer pump, with a capacity of 200m3/h in addition to the existing four pumps; 
  • Supply, Installation and commissioning of one (1) new set of strainer and micron filter with a capacity of 400m3/h in addition to the existing three sets. 
  • Supply, Installation and commissioning of one (1) One (1) new filter water separator with a capacity of 400m3/h in addition to the existing three sets. 
  • Associated necessary piping, civil / structural, electrical and Instrumentation works

IPS – Intermediate Pigging Station

  • Removal of existing Pig Receiver and relocating to AMIA Fuel Farm 
  • Tie-in connection between Existing DIA Pipeline and 20 inch diameter new pipeline to AMIA Fuel Farm 
  • Supply, installation and commissioning of 12 inch size Ultrasonic flow meter for Leak detection for the new pipeline to AMIA Fuel Farm 
  • Associated necessary piping, civil / Structural, electrical and Instrumentation works

AMIA Fuel farm

  • Installation of Pig receiver relocated from intermediate pigging station; 
  • Supply, installation and commissioning of Six (6) set of Strainers and Micron Filters with a capacity of 400m3/h each. 
  • Supply, installation and commissioning of Six (6) Filter Water Separators with a capacity of 400m3/h each. 
  • Design and construction of Shelter / Covered shed for Filters 
  • Associated necessary piping, civil / structural, electrical ,Instrumentation and fire protection systems.

Project Details

Project Name :

JET FUEL PIPELINE TO AL MAKTOUM INTERNATIONAL AIRPORT

Clients :

HORIZON EMIRATES TERMINALS LLC

Location :

Jebel Ali, UAE

Duration :


AWARD DATE : DEC 2017
DURATION OF PROJECT: 18 Months

OUR PROJECTS

ADNOC Gas Processing

Project Description EPC for Supply, Installation & Commissioning of Multiple...

CPECC

Project Description Civil & Structural Works for Full Field Development...

Al Ghurair

Project Description Mechanical, Electrical, and Instrumentation (E&I) Works for New...

EGA

Project Description The existing Underground Fuel Gas line (installed 7...

ENOC

Project Description HETL intends to extend the existing Jet Fuel...

FOT

Project Description Fujairah Oil Terminal (FOT) a major Crude operator...

Dp World

Pneumatic Ship-Unloader Pneumatic ship-unloader used to unload bulk goods from...