ENOC
Project Description
HETL intends to extend the existing Jet Fuel pipeline system with a branch to Al Maktoum International Airport.
Project consists of installing a 20” underground pipeline for length of 16.5 Km from the existing intermediate pigging station to AMIA Fuel Farm, installing a Jet Fuel filtering station at AMIA Fuel Farm and tie in to AMIA Fuel Farm fuel supply piping manifold.
The Works shall be carried out at different locations :
- Horizon Emirates Terminal (located within Jebel Ali Free Zone)
- IPS – Intermediate Pigging Station
- AMIA Fuel farm
- Pipeline corridors owned by DUSUP, RTA /DM and corridor and plots owned by DWC-Dubai South
- Detailed Scope
- Pipeline corridors
Pipeline corridors owned by DUSUP, RTA /DM and corridor and plots owned by DWC-Dubai South
- Supply and installing a 20” underground pipeline for length of 16.5 Km from the existing intermediate pigging station to AMIA Fuel Farm.
- Associated Excavation and Backfilling works ,Dewatering & Shoring Works
- Road crossing Works along the pipe line route
Horizon Emirates Terminal (located within Jebel Ali Free Zone)
- Supply , Installation and commissioning of one (1) new Jet Fuel Transfer pump, with a capacity of 200m3/h in addition to the existing four pumps;
- Supply, Installation and commissioning of one (1) new set of strainer and micron filter with a capacity of 400m3/h in addition to the existing three sets.
- Supply, Installation and commissioning of one (1) One (1) new filter water separator with a capacity of 400m3/h in addition to the existing three sets.
- Associated necessary piping, civil / structural, electrical and Instrumentation works
IPS – Intermediate Pigging Station
- Removal of existing Pig Receiver and relocating to AMIA Fuel Farm
- Tie-in connection between Existing DIA Pipeline and 20 inch diameter new pipeline to AMIA Fuel Farm
- Supply, installation and commissioning of 12 inch size Ultrasonic flow meter for Leak detection for the new pipeline to AMIA Fuel Farm
- Associated necessary piping, civil / Structural, electrical and Instrumentation works
AMIA Fuel farm
- Installation of Pig receiver relocated from intermediate pigging station;
- Supply, installation and commissioning of Six (6) set of Strainers and Micron Filters with a capacity of 400m3/h each.
- Supply, installation and commissioning of Six (6) Filter Water Separators with a capacity of 400m3/h each.
- Design and construction of Shelter / Covered shed for Filters
- Associated necessary piping, civil / structural, electrical ,Instrumentation and fire protection systems.
Project Details
Project Name :
JET FUEL PIPELINE TO AL MAKTOUM INTERNATIONAL AIRPORT
Clients :
HORIZON EMIRATES TERMINALS LLC
Location :
Jebel Ali, UAE
Duration :
AWARD DATE : DEC 2017
DURATION OF PROJECT: 18 Months